检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周景[1] 张衡[1] 刘盾盾 程浩忠[1] 励刚 张啸虎 ZHOU Jing;ZHANG Heng;LIU Dundun;CHENG Haozhong;LI Gang;ZHANG Xiaohu(Key Laboratory of Control of Power Transmission and Conversion,Ministry of Education,Shanghai Jiao Tong University,Shanghai 200240,China;East China Power Grid Company,Shanghai 200210,China)
机构地区:[1]上海交通大学,电力传输与功率变换控制教育部重点实验室,上海200240 [2]国家电网有限公司华东分部,上海200210
出 处:《电力自动化设备》2021年第12期136-142,共7页Electric Power Automation Equipment
基 金:上海市青年科技英才扬帆计划项目(20YF1418900)。
摘 要:为提高电网抵御多重故障的能力,常在输电网规划中嵌入N-k安全网络约束。但该方式未考虑故障间关联性,致使故障场景数量庞大且部分场景与实际不符,可能导致规划方案投资冗余。在计及故障关联性的基础上,提出一种考虑连锁故障的输电网双层扩展规划模型。上层模型以线路投资、运行及切负荷成本之和最小为目标,考虑了故障链约束;下层模型以切负荷最小为目标,对上层模型得到的规划方案进行连锁故障校验。上下层模型以故障链约束为纽带,通过迭代添加新的约束,达到降低求解规模、加快算法收敛的目的。以IEEE RTS-24系统为分析算例,仿真结果表明所提模型能够在抵御连锁故障的同时提升规划方案经济性。To improve the power grid’s ability to withstand multiple-faults,N-k safety network constraints are often embedded in transmission network planning.The correlation between faults is not considered by the planning method,which leads to a large number of fault scenarios and some of them are inconsistent with the actual situation,moreover leads to redundant investment.A two-level transmission network expansion planning model considering cascading failures is proposed on the basis of considering the fault correlation.The upper model aims at minimizing the sum of line investment,operation and load shedding costs,and considers fault chain constraints.While the lower model aims at minimizing the load shedding,and checks the cascading failure of the planning method obtained from the upper model.The upper and lower models are linked by fault chain constraints,and new constraints are added by iteration to reduce the solution scale and accelerate the convergence of the algorithm.Taking the IEEE RTS-24 system as an analysis example,the simulative results show that the proposed model can resist cascading failures while improve the economy of the planning method.
关 键 词:输电网扩展规划 连锁故障 故障链 N-k安全网络约束
分 类 号:TM711[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.187.74