作 者:刘瑜[1] LIU Yu(Baosteel Engineering Techology Group Co.,Ltd.,Shanghai 201900,China)
出 处:《冶金动力》2021年第6期65-67,共3页Metallurgical Power
摘 要:介绍了国内某钢厂板坯连铸机改造升级的必要性。针对存在的问题,提出了辊列优化、二冷分区优化,选用高效喷嘴,增加二级过滤手段,管线三维设计的方案,工期由89天缩短为59天,实现了降本增效的目标。The necessity of transformation and upgrading of slab caster in a domestic steel plant is introduced.In view of the existing problems,the optimization schemes of roll row and secondary cooling zone,selection of high-efficiency nozzle,addition of secondary fil⁃tration means and three-dimensional design of pipeline were put forward.The construction period was shortened from 89 days to 59 days,realizing the goal of cost reduction and effi⁃ciency increase.