检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张德生 祝琨[2] 张赛 杜尚宇 ZHANG De-sheng;ZHU Kun;ZHANG Sai;DU Shang-yu(CCTEG Coal Mining Research Institute,Beijing 100013,China;China Coal Research Institute,Beijing 100013,China)
机构地区:[1]中煤科工开采研究院有限公司,北京100013 [2]煤炭科学研究总院,北京100013
出 处:《煤炭工程》2021年第11期1-5,共5页Coal Engineering
基 金:国家自然基金项目(U1610251);天地科技创新创业资金专项重点项目(2020-TD-ZD005,2019-TD-ZD001)。
摘 要:为提高综采工作面开采效能,加快智能化开采技术的推广应用,以2~3m中厚煤层千万吨级产能为目标分析了影响快速采煤的关键因素,即采煤机截割速度、液压支架跟机速度、刮板输送机输送能力,开采路径协同规划等。简述了国内外快速采煤技术的发展过程及先进实践案例,包括美国Tunnel Ridge煤矿2m左右煤层以及国内转龙湾煤矿3~4m千万吨智能高效开采工作面等。提出了我国中厚煤层千万吨级产能快速采煤技术装备攻关方向和目标:工作面长度400m以上;采煤机运行速度15m/min以上;液压支架跟机速度6s左右;刮板输送机链速2m/s左右及链条动态张紧技术,同时加强单机设备及系统可靠性管理;成套装备单日运行时间提高到20h以上。研究成果可以为中厚煤层快速采煤的技术研发和工程建设提供参考。In order to improve the mining efficiency of fully-mechanized mining face and accelerate the popularization and application of intelligent mining technology, the key factors affecting the mining efficiency, including cutting speed of shearer, following speed of hydraulic support, conveying capacity of scraper conveyor, collaborative planning of mining path and so on, were analyzed with the target of ten million ton production capacity of 2~3 m medium-thick coal seam. The development process and advanced cases of key technologies of rapid coal mining at home and abroad are briefly described, including the high efficiency mining technology of about 2 m coal seam in Tunnel Ridge Mine in the US and the 3~4 m high efficiency intelligent mining face with a capacity of ten million tons in Zhuanlongwan Coal Mine in China. The specific research direction and target of localization technology and equipment for fast coal mining with ten million ton capacity in medium-thick coal seam are put forward: the length of mining face is over 400 m;shearer running speed reaches 15 m/min, following speed of hydraulic support is 6 s;scraper conveyor speed is about 2 m/s with chain dynamic management technology and the reliability of equipment and system is strengthened;the daily operation time is increased to over 20 h.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170