检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴均 汪艮忠 毛立 谢兴博 潘伟纲 李天根 马军喜 王志强 黄寅生[2] WU Jun;WANG Genzhong;MAO li;XIE Xingbo;PAN Weigang;LI Tiangen;MA Junxi;WANG Zhiqiang;HUANG Yinsheng(Zhejiang Limin Chemical Co.,Ltd.,Lishui 323300,China;School of Chemical Engineering,Nanjing University of Science and Technology,Nanjing 210094,China;School of Chemistry and Chemical Engineering,Army Engineering University of PLA,Nanjing 210007,China)
机构地区:[1]浙江利民化工有限公司,浙江丽水323300 [2]南京理工大学化工学院,江苏南京210094 [3]陆军工程大学化学与化工学院,江苏南京210007
出 处:《弹道学报》2021年第4期91-96,共6页Journal of Ballistics
摘 要:为了解决战场上开挖单人掩体费时费力的问题,研究采用分段装药、延期爆破的方法快速构筑单人掩体,采用AUTODYN软件,建立不同延期时间、上部装药量、下部装药量共9个模型,通过对比计算得到的爆破漏斗尺寸,发现爆破漏斗的尺寸和上、下部装药量呈正相关,爆破漏斗的尺寸和延期时间有关,延期时间50 ms爆破时产生的炸坑体积最大,并通过爆破实验的方式对爆破模型模拟的情况进行了验证,实验得到的数据和计算得到数据较为符合,通过调整隔爆层长度发现两段装药隔爆长度在50 cm以下时可能会发生殉爆现象。In order to solve the time-consuming and laborious problem of digging a single-person bunker on the battlefield,the method of subsection charging and delayed blasting was adopted to quickly build a single-person bunker.AUTODYN software was used to establish a total of 9 models with different delay time,upper charging amount and lower charging amount.The calculated sizes of blasting funnel were compared.The result shows that the size of the blasting funnel was positively correlated with the charge of the upper and lower parts,and the size of the blasting funnel was related to the delay time.The largest volume of the pit is generated when the delay time is 50 ms.The simulation of the blasting model was verified by blasting experiment.The experimental data are in good agreement with the calculated data.By adjusting the length of the flameproof layer,it is found that the sympathetic detonation may occur when the flameproof length of two sections of charge is less than 50 cm.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.203.120