检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:欧正辉 Ou Zheng-hui(Nanning City Surveying and Mapping Geographic Information Institute Co.,Ltd.,Nanning 530022,Guangxi Zhuang Autonomous Region,China)
机构地区:[1]南宁市勘察测绘地理信息院有限公司,广西南宁530022
出 处:《建筑与装饰》2021年第30期75-78,共4页Construction & Decoration
摘 要:伴随着我国城镇化率的逐步提升,我国城市建设的规模逐步扩大,城市综合地下管线测量的难度正在逐步提升。城市地下管线普查的后时代,管线综合管理的有效机制建立和选择,事关管线管理工作的可持续发展的重要问题。从目前国内各城市地下管线综合管理实践观察,已形成多种管理模式,但也各有利弊,需要城市管线管理者来研究与探索。本文就管线竣工测绘问题和对策进行了简要分析。With the gradual increase in the urbanization rate in China,the scale of urban construction in China is gradually expanding,and the difficulty of urban comprehensive underground pipeline measurement is gradually increasing.In the post era of the general survey of urban underground pipelines,the establishment and selection of an effective mechanism for comprehensive pipeline management are the important issue related to the sustainable development of pipeline management.From the observation of the current comprehensive management practice of underground pipelines in various cities in China,a variety of management models have been formed,but each has its own advantages and disadvantages,which require urban pipeline managers to study and explore.This article briefly analyzes the problems and countermeasures of pipeline completion surveying and mapping.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.217