悬浇箱梁施工质量探析——英德市省道S292线延长线一级公路新建工程第三合同段  被引量:5

Discussion on Construction Quality of Hanging Pouring Box Girder——The Third Contract Section of the New Highway Construction Project of Yingde City Provincial Road S292 Line Extension Highway

在线阅读下载全文

作  者:林文良 LIN Wen-liang(Poly Growth Engineering Co.Ltd.,Guangzhou 510620,China)

机构地区:[1]保利长大工程有限公司,广州510620

出  处:《工程建设与设计》2021年第23期227-229,共3页Construction & Design for Engineering

摘  要:目前,在桥梁建设中,采用挂篮进行悬臂浇筑箱梁施工工艺非常成熟,但是施工质量参差不齐,在实际施工过程中,其质量控制点多。论文结合英德市省道S292线延长线一级公路新建工程第三合同段北江四桥主桥的挂篮悬臂施工,分析悬臂现浇过程中的质量控制重点、要点,为后续同种类型桥梁工程施工提供借鉴。At present,in the bridge construction,the construction technology of cantilever casting box girder with hanging basket is very mature,but the construction quality is uneven,in the actual construction process,there are many quality control points.This article combined with the third contract of S292 line new project of the Beijiang No.4 bridge cantilever construction,analyzed the key points of quality control in cantilever cast-in-place process,to provide reference for the follow-up construction of the same type bridge engineering.

关 键 词:挂篮 悬臂现浇 桥梁工程 

分 类 号:TU74[建筑科学—建筑技术科学] U445.4[建筑科学—桥梁与隧道工程]

 