检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周荣 晏宇[2] 钟久安 ZHOU Rong;YAN Yu;ZHONG Jiu'an(PowerChina Chengdu Engineering Co., LTD, Chengdu, Sichuan, 611130;Ertan International Engineering Consulting Co., LTD , Chengdu, Sichuan, 611130;Sichuan Gotone Geotechnical Technology Co., LTD, Chengdu, Sichuan, 610073)
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都611130 [2]四川二滩国际工程咨询有限责任公司,四川成都611130 [3]四川共拓岩土科技股份有限公司,四川成都610073
出 处:《四川水力发电》2021年第S01期75-79,共5页Sichuan Hydropower
摘 要:重建的多诺水电站放空洞上平段钢衬背后出现渗漏现象,对上、下弯段的施工及洞室稳定造成不利影响。采用沉箱引排形成盖重再灌注特种材料的方法实现了封堵目标。系统叙述了封堵施工的情况以及渗漏水封堵后取得的效果。Leakage occurs behind the steel lining of the upper flat section of the reconstructed venting tunnel of Duono Hydropower Station,which has an adverse impact on the construction of the upper and lower curved sections and the stability of the tunnel.Caisson drainage is applied to form cover weight first followed by grouting of special material to seal the leakage.This paper systematically describes the construction of sealing and the sealing effect of water leakage.
分 类 号:TV554[水利工程—水利水电工程] TV512
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195