作 者:倪亚军 李锋刚[2] NI Yajun;LI Fenggang(Sima Coal Industry Co.,Ltd.,Lu'an Chemical Group of Shanxi,Changzhi 047105,Shanxi,China;Shanxi Institute of Mechanical and Electrical Engineering,Changzhi 046011,Shanxi,China)
机构地区:[1]山西潞安化工集团司马煤业有限公司,山西长治047105 [2]山西机电职业技术学院,山西长治046011
出 处:《能源与节能》2021年第12期12-14,共3页Energy and Energy Conservation
基 金:山西潞安化工集团科研开发项目(2019140408000076)。
摘 要:为解决成庄矿五盘区北翼大巷矿压显现强烈,补强效果差等问题,提出采用高强锚杆锚索配合滞后注浆支护技术,并进行了现场试验。试验结果表明,采用该设计后巷道迎头80 m范围顶底板移近量峰值为502 mm,两帮移近量峰值为397 mm,巷道变形量得到有效控制,有效保证了巷道的稳定性。In order to solve the problems of strong mining pressure and poor reinforcement effect in the north wing roadway of the 5th panel of Chengzhuang Coal Mine,this paper proposed the use of high-strength bolts and cables with lagging grouting support technology,and field tests were carried out.The test results showed that after adopting this design,the peak value of the approa-ching amount of the roof and floor of the roadway heading 80 m was 502 mm,and the peak value of the approaching amount of the two sides was 397 mm,the deformation of the roadway was effectively controlled,and the stability of the roadway was effec-tively ensured.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.26.90