检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王黎明 夏海 朱鑫昱 肖林[1] 黄明桥 WANG Li-ming;XIA Hai;ZHU Xin-yu;XIAO Lin;HUANG Ming-qiao(China Construction Second Engineering Bureau Co.,Ltd.,100010,Beijing,China)
机构地区:[1]中国建筑第二工程局有限公司,北京100010
出 处:《建筑技术》2021年第12期1425-1428,共4页Architecture Technology
摘 要:以河滨杂填土天然地基房屋加固施工项目为例,结合18号和21号别墅筏形基础工程施工面临的工程“倾斜”“沉降”问题,采用锚杆静压水气纠偏扶正法进行纠偏加固。经实时监测及数据曲线分析,该方案可行,效果较好,地基承载力合理,可保证建筑安全。Taking the reinforcement construction project of natural foundation house with riverside miscellaneous fill as an example,combined with the problems of“inclination”and“settlement”in the construction of raft foundation engineering of No.18 and No.21 villa,the anchor static pressure water vapor correction method is used to rectify and reinforce the deviation.Through real-time monitoring and data curve analysis,the scheme is feasible,the effect is good,the foundation bearing capacity is reasonable,and the construction safety can be guaranteed.
关 键 词:锚杆静压水气纠偏扶正 河滨杂填土 天然地基 房屋加固
分 类 号:TU731.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229