水电站溢流坝坝顶交通桥现浇施工方案  被引量:3

Cast-in-situ Construction Scheme of Traffic Bridge on Dam Crest of Overflow Dam in Hydropower Station

在线阅读下载全文

作  者:瞿疆 郭燚 王倩 QU Jiang;GUO Yi;WANG Qian(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2021年第12期41-44,共4页Yunnan Water Power

摘  要:非洲某一项目水电站溢流坝段坝顶交通桥吊装条件差,现场没有足够起吊设备,鉴于非洲施工物资匮乏的实际情况,项目打破常规,采用现浇方法进行施工,工程按期安质完工。项目部对方案进行了充分论证,对底梁支撑体系进行了详细验算,并形成了1套完整的施工工艺流程及详细施工方法。For a project in Africa,the lifting condition of the traffic bridge on the dam crest of the overflow dam section is poor and there is not enough lifting equipment on site.Due to the shortage of construction materials in Africa,the project breaks the rule and is constructed by cast-in-situ method.The project is completed on time and with good quality.The project department has fully demonstrated the scheme,checked and calculated the bottom beam support system in detail,and formed a complete construction process and detailed construction method.

关 键 词:坝顶交通桥 交通桥现浇 梁底模 钢管小楞 钢管大楞 立杆稳定 支架 模板 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象