检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宗格 周俊义 吴锦涛 ZHANG Zong-ge;ZHOU Jun-yi;WU Jin-tao(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2021年第12期164-166,共3页Yunnan Water Power
摘 要:预制T梁是公路桥梁中最为普遍的一种上部结构形式,预制T梁制梁台座形式多样、止浆条材料种类繁多,梁场建设过程中往往因为台座设计不合理、止浆条材料选用不当等原因造成T梁成品存在较多质量缺陷,影响T梁的外观质量,后期需进行大量的缺陷修复工作。当出现T梁制梁台座设计不合理时,如何能快速对台座进行优化,不仅可以根治质量通病、消除质量隐患,并且能保证施工进度,节约施工成本。Prefabricated T-beam is the most common form of upper structure in highway bridges.Prefabricated T-beam pedestal has various forms and various grout stop materials.During the construction of beam yard,there are many quality defects in T-beam products due to unreasonable design of platform and improper selection of grout stop material,which affect the appearance quality of T-beam.A lot of defect repair work is required in the later stage.When unreasonable design of T-beam pedestal occurs,rapid optimization of pedestal can not only eliminate common quality problems and potential quality hazards,but also ensure construction progress and save construction costs.
分 类 号:U448.212[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7