一次使用顺槽巷道低密度高强度支护技术研究  被引量:1

Study on Low-density and High-strength Support Technology of Once-used Tunnel Roadway

在线阅读下载全文

作  者:李云岗 Li Yungang(Jinneng Holding Coal Industry Group Sihe Mine,Shanxi Jincheng 048000)

机构地区:[1]晋能控股煤业集团寺河矿,山西晋城048000

出  处:《山东煤炭科技》2021年第12期55-57,共3页Shandong Coal Science and Technology

摘  要:为解决成庄矿大采高顺槽巷道支护工作量大、成巷速度慢的问题,以43223巷为背景,采用FLAC数值模拟软件对不同锚杆、锚索支护密度下的支护效果进行分析,得到低支护密度下的合理锚杆、锚索排距。通过井下现场试验可知,采用低密度高强度支护设计后,巷道变形量很小,在满足巷道安全使用的同时减少了支护工作量,提高了成巷速度和效率。In order to solve the problem of large support workload and slow speed of roadway formation of roadway with large mining height in Chengzhuang Coal Mine,taking the 43223 roadway as the background,the support effect under different bolt and anchor cable support density is analyzed by FLAC numerical simulation software,the reasonable bolt and anchor cable row distance under low support density is obtained.Through the underground field test,it is known that after adopting the low-density and high-strength support design,the deformation of the roadway is very small,which not only meets the safe use of the roadway,but also reduces the supporting workload and improves the speed and efficiency of roadway formation.

关 键 词:低密度 高强度 顺槽 支护 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象