检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩晶 HAN Jing
机构地区:[1]山西万家寨水控水资源有限公司,山西太原030012
出 处:《山西水利科技》2021年第4期9-11,15,共4页Shanxi Hydrotechnics
摘 要:山西省万家寨引黄入晋工程已累计运行17年,南干二级泵站6号机组电动机转子吊出后,检查定子时发现定子绕组绝缘层存在颜色变白现象。为确保机组的安全稳定运行,探索定子绕组电晕腐蚀成因及现场处理方法,为一期其它14台机组提供可借鉴处理方案,以降低生产运行成本,提高电动机可靠性,将对日方电动机设计、制造、安装工艺进行分析,提出国产化替代的意见。The Wanjiazhai Yellow River Diversion Project in Shanxi Province has been in operation for 17 years.After the motor rotor of Unit 6 of Nangan Secondary Pumping Station was hoisted out,it was found that the stator winding insulation layer turned white when the stator was inspected.In order to ensure the safe and stable operation of units,the causes of corona corrosion of stator windings and on-site treatment methods are explored,and reference treatment schemes for other 14 units in Phase I are provided,so as to reduce production and operation costs and improve motor reliability,the Japanese motor design,manufacturing and installation process will be analyzed,and suggestions for localization and substitution will be put forward.
分 类 号:TV73[水利工程—水利水电工程] TM301[电气工程—电机]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171