某矿掘进进度与回采计划编制中外对比分析  

A Comparison and Analysis Between the Chinese Version and Foreign Version on the Advancing Schedule and Stoping Schedule of the Same Mine

在线阅读下载全文

作  者:刘国栋 LIU Guo-dong

机构地区:[1]中国恩菲工程技术有限公司,北京100038

出  处:《有色设备》2021年第6期91-95,共5页Nonferrous Metallurgical Equipment

摘  要:本文介绍了某铜矿山基本情况,简述了中外双方各自编制的掘进进度、回采计划,中方按国内标准编制,外方采用西方通用标准,其编制的流程和形式是相似的。文中分析了双方设计思路、方式方法的不同之处,掘进及回采计划的编制结果与矿山生命周期的契合度也有差异。针对海外项目,建议将外方通用设计模式融合到国内设计中来。In this paper, the basic situation of a copper mine is briefed, and the advancing schedule and stoping schedule prepared by Chinese and foreign parties are briefly described respectively. The Chinese version is prepared according to Chinese standards, while the foreign version adopts western standard.The process and format of the preparation are similar. In this paper, the differences of design ideas and methods between the two versions are analyzed. There are also differences in the consistence between the outcome of the advancing & stoping scheduling and the life cycle of the mine. For overseas projects, it is suggested to integrate foreign common design model into the Chinese design.

关 键 词:掘进进度 采掘比 回采计划 矿山生命周期 

分 类 号:TD263.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象