穿堤建筑物工程施工对长江荆江大堤的防洪影响  被引量:1

Influence of the Construction of Levee-crossing Structure on the Flood Control Performance of Jingjiang Levee of the Yangtze River

在线阅读下载全文

作  者:贾振中 刘玮 陈婷 JIA Zhenzhong;LIU Wei;CHEN Ting(Jingzhou Sihu Project Management Bureau, Jingzhou 434000, China)

机构地区:[1]荆州市四湖工程管理局,湖北荆州434000

出  处:《水电与新能源》2021年第12期57-60,78,共5页Hydropower and New Energy

摘  要:新建盐卡泵站工程出水压力箱涵穿越长江荆江大堤,因地质条件复杂,历史上此堤段多次发生渗透变形破坏,是长江荆江大堤重要的险工险段之一。通过对穿堤建筑物的精心设计、施工,经检测资料分析和2020年长江高洪水位(超警戒)的实际运行考验,该穿堤建筑物工程设计与施工满足规范要求。The outlet pressure box culvert of the newly built Yanka Pumping Station crosses the Jingjiang Levee of the Yangtze River.Due to the complex geological conditions,seepage induced deformation and failure have occurred many times in this dangerous levee section.The design and construction of the levee-crossing structure are introduced.Analysis of the monitoring data and the practical operation of the levee under high flood level(exceeding the warning level)in 2020 show that the design and construction of the structure meet the specification requirements.

关 键 词:穿堤建筑物 工程施工 荆江大堤 长江防洪影响 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象