Effect of Failure Mode of Taut Mooring System on the Dynamic Response of A Semi-Submersible Platform  

在线阅读下载全文

作  者:WANG Teng HAO jun-jie WU Xiao-ni LI Ye WANG Xiao-tong 

机构地区:[1]Department of Naval Architecture and Offshore Engineering,China University of Petroleum(East China),Qingdao 266580,China [2]Shanghai Key Laboratory for Digital Maintenance of Buildings and Infrastructure,Department of Civil Engineering,Shanghai Jiao Tong University,Shanghai 200240,China [3]State Key Laboratory of Ocean Engineering,School of Naval Architecture,Ocean and Civil Engineering,Shanghai Jiao Tong University,Shanghai 200240,China [4]China National Oil and Gas Exploration and Development Co.,Ltd.,Beijing 100034,China

出  处:《China Ocean Engineering》2021年第6期841-851,共11页中国海洋工程(英文版)

基  金:financially supported by the National Natural Science Foundation of China(Grant No.51809165).

摘  要:Mooring system failure can lead to largely different dynamic response of floating structures when compared to the response under the condition of intact mooring system.For a semi-submersible platform with taut mooring system under extreme environmental conditions,the typical mooring system failure includes anchor line breaking failure due to the broken anchor line,and the anchor dragging failure caused by the anchor failure in the seabed soil due to the shortage of the anchor bearing capacity.However,study on the mooring failure caused by anchor failure is rare.The current work investigates the effect of three failure modes of taut mooring system on dynamic response of a semi-submersible platform,including one line breaking failure,two lines breaking failure,and one line breaking with one line attached anchor dragging failure.The nonlinear polynomial mooring line model in AQWA was used with integrating the load and displacement curve from the anchor pulling study to characterize the anchor dragging behavior for mooring system failure caused by the anchor failure.The offsets of the platform and the tension of mooring lines were analyzed for mooring system failure with 100-year return period.It is found that the mooring failure of one line breaking with one line attached anchor dragging is a case between the other two mooring failures.The traditional mooring analysis considering only the damaged condition with one line breaking is not safe enough.And the simple way of mooring analysis of two lines breaking is too conservative for the costly offshore engineering.

关 键 词:taut mooring system failure semi-submersible platform dynamic response anchor dragging line breaking 

分 类 号:P75[天文地球—海洋科学] U674.38[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象