抚州市孝义港下游段整治改造工程设计排涝流量确定  

Determination of Design Drainage Flow of Downstream Regulation and Reconstruction Project of Xiaoyi Port in Fuzhou City

在线阅读下载全文

作  者:蒋小宝 JIANG Xiao-bao(Xinyu City Water Conservancy Electric Power Construction Engineering Co.Ltd.,Xinyu 338025,Jiangxi,China)

机构地区:[1]新余市水利电力建筑工程有限公司,江西新余338025

出  处:《水利科技与经济》2021年第12期51-53,72,共4页Water Conservancy Science and Technology and Economy

摘  要:根据孝义港下游地区排涝区实际情况,对工程实施段排涝区设计排涝流量进行分析。分别采用径流系数法、降水扣损法两种方法对排涝流量进行计算,采用径流系数法计算结果较为可靠,即P=10%最大一日净雨量为122.8 mm,最大三日净雨量为202.7 mm。计算结果为工程设计和施工洪水确定提供参考。According to the actual situation of the drainage area in the lower reaches of Xiaoyi port,the design drainage flow of the drainage area in the implementation section of the project is analyzed.The two methods of“runoff coefficient method”and“precipitation deduction method”are respectively used to calculate the drainage flow.The calculation results of“runoff coefficient method”are more reliable,that is,P=10%,the maximum one-day net rainfall is 122.8mm,and the maximum three-day net rainfall is 202.7mm.According to the calculation results,it provides a reference for engineering design and construction flood determination.

关 键 词:防洪整治 排涝流量 施工洪水 

分 类 号:TV87[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象