检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯强 李欣 Hou Qiang;Li Xin(Municipal Engineering Design and Research Institute in Taiyuan,Taiyuan 030002,China;Taiyuan Urban&Rural Planning Design Institute,Taiyuan 030002,China)
机构地区:[1]太原市市政工程设计研究院,山西太原030002 [2]太原市城乡规划设计研究院,山西太原030002
出 处:《山西建筑》2022年第2期185-187,共3页Shanxi Architecture
摘 要:半坡东街、都司街雨水排除属于水西关街泵排系统,是水西关街泵排系统的重要组成部分,沿线收集和转输上游共约310 ha汇水范围。通过半坡东街、都司街雨水D 3000 mm的雨水管的顶管设计和实施,对完善该区域雨水系统,雨季行洪起着至关重要的作用。The paper indicates the rainwater drainage of Banpodong Street and Dusi Street belongs to the pump-drainage system of Shuixiguan Street,which is the essential part of the pump-drainage system of the street,illustrates the collection of the about 310 ha along the routes and the upper reaches,and explains that it plays the important role of improving the rainwater system and flood discharge during rain seasons by design and implementation of the pipe jacking of D 3000 mm rainwater pipes of Banpodong Street and Dusi Street.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30