检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Mohamed G.Mousa S.M.Allam Essam M.Rashad
出 处:《Journal of Control and Decision》2018年第2期209-227,共19页控制与决策学报(英文)
摘 要:This paper presents a scalar volt per hertz(V/f)control technique for maximum power tracking of a grid-connected wind-driven brushless doubly fed reluctance generator(BDFRG).The proposed generator has two stator windings namely;power winding,directly connected to the grid and control winding,connected to the grid through a bi-directional converter.In order to enhance the performance of the proposed scalar-control strategy,a soft starting method is suggested to avoid the over-current of the bi-directional converter.Moreover,the capability of generator speed estimation for sensorless control is also studied.The capability of the proposed scalar-control technique is validated using a sample of simulation results.In addition,the presented simulation results ensure the effectiveness of the proposed control strategy for maximum wind-power extraction under windspeed variations.Furthermore,the results show that the estimated generator speed is in a good accordance with the actual generator speed which supports sensorless control capability.
关 键 词:Brushless doubly fed reluctance generator wind-power generation systems soft starting scalar V/f control maximum windpower extraction speed estimation
分 类 号:TP3[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15