卡拉贝利水利枢纽工程过鱼系统方案设计  被引量:1

Scheme design of fish-passing system of Karabelle Water Control Project

在线阅读下载全文

作  者:孙宾[1] Sun Bin(Xinjiang Water Conservancy and Hydropower Survey and Design Research Institute,Urumqi 830000,Xinjiang)

机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000

出  处:《吉林水利》2021年第12期39-43,共5页Jilin Water Resources

摘  要:为合理确定卡拉贝利水利枢纽过鱼系统工程设计方案,采用实证研究法,依据卡拉贝利水利枢纽工程位于地震高震区且枢纽已建成等工程特点,利用电站尾水集诱鱼+坝后水平轨道运鱼+AGV小车运鱼+坝前轨道运鱼、投鱼组合方式,重点分析各种过鱼系统工程方案的优缺点,设计成果可为类似工程的过鱼系统提供技术借鉴。In order to resonably determine the design scheme of the fish-passing system project of Karabelle Water Control Project,the empirical research method is adopted.According to the engineering characteristics of the Project,which is located in seismic zone,the advantages and disadvantages of various fish-passing system are emphatically analyzed by using the combination mode of trailing fish collection in the tail water of power station,horizontal track fish transport,AGV trolley fish transport and fish delivery in front of the dam.The results provide a thecnical reference for the fish-passing system of similar engineering.

关 键 词:轨道升鱼机 AGV小车运鱼 高震区 坝前轨道运鱼、投鱼 

分 类 号:S956.3[农业科学—水产养殖] TV61[农业科学—水产科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象