检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:易平 YI Ping(China Nerin Engineering Technology Co.,Ltd.,Nanchang,Jiangxi 330038,China)
机构地区:[1]中国瑞林工程技术股份有限公司,江西南昌330038
出 处:《有色冶金设计与研究》2021年第6期37-40,共4页Nonferrous Metals Engineering & Research
摘 要:以杭州市危险废物处置中心安全填埋场为例,研究了快满容的危险废物填埋场扩容问题。通过分析项目地形地貌,结合地质勘测资料,分析了堆体的受力情况,并通过摩根斯坦—普莱斯法对现状断面和拟扩容后断面进行了边坡稳定性分析。根据扩容前后不同工况下抗滑稳定安全计算,得出本项目扩容工程从技术上可行的结论。Taking the safe landfill of Hangzhou hazardous waste disposal center as an example,the expansion of hazardous waste landfill with fast full capacity is studied.By analyzing the landform of the project,combined with the geological survey data,the stress of the pile body is analyzed,and the slope stability of the current section and the section to be expanded is analyzed by Morgenstein price method.According to the safety calculation of anti sliding stability under different working conditions before and after capacity expansion,it is concluded that the capacity expansion project of the project is technically feasible.
分 类 号:X705[环境科学与工程—环境工程] TD824.8[矿业工程—煤矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.83.94