作 者:孙凌志[1] 夏秋艳 任杰 SUN Lingzhi;XIA Qiuyan;REN Jie(Shandong University of Science and Technology,Qingdao 266510,China)
机构地区:[1]山东科技大学,山东青岛266510
出 处:《建筑经济》2021年第12期39-45,共7页Construction Economy
摘 要:工程总承包项目设定最高投标限价将深刻影响招投标双方权益。归纳分析当前编制最高投标限价过程中常见的六种“不一致”计价现象,基于扎根理论归纳萃取影响工程总承包项目最高投标限价的关键因素并对其进行类属划分;对比分析基于初步设计概算、模拟招标工程量清单和市场询价三种编制方法的优缺点及适用条件,阐述常见的费率下浮和模拟清单两种计价模式的选择及改进建议;最后从政策制度、管理水平、组织人员三个方面提出改进最高投标限价计价质量的策略。The maximum bid limit price set by general engineering contracting projects will profoundly affect the rights and interests of both tenderers and bidders.The six common“inconsistent”pricing phenomena are summarized and analyzed in the current process of editing and reviewing the maximum bidding price.Based on the Grounded Theory,the key factors affecting the maximum bidding price of general contracting projects are summarized and extracted,subsequently they are categorized;the comparative analysis the advantages and disadvantages and applicable conditions of the three compilation methods,based on the budget estimate of the preliminary design,simulated bidding quantity list and market inquiry,are compared and analyzed.Then the selection and improvement suggestions of the two common pricing modes of rate reduction and simulated list are elaborated.Last but not least,the strategies to improve the valuation quality of the maximum bid limit price are proposed from three aspects of the policy system,management level and organization.
关 键 词:工程总承包 最高投标限价 影响因素 编制方法 计价模式
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117