特高压直流输电线路铁塔实验分析  

Test Analysis of UHV DC Transmission Line Iron Tower

在线阅读下载全文

作  者:王金龙 Wang Jin-long

机构地区:[1]中国能源建设集团山西省电力勘测设计院有限公司,山西太原030001

出  处:《电力系统装备》2021年第23期63-64,共2页Electric Power System Equipment

摘  要:锡盟—泰州±800 kV高压直流输电线路工程,首次采用8×JL1/G2A-1250/100大截面导线,为保证线路安全可靠运行,对典型塔ZC30103B进行真型实验,对其安全可靠进行了验证,并对其在控制工况下破坏过程的位移、应变以及破坏情况进行了分析。实验表明,ZC30103B塔设计安全、经济,实测值与理论值吻合,满足工程实际需要。For the Ximeng-Taizhou±800 kV UHV DC transmission line project,8×JL1/G2A-1250/100 large cross-section conductors were used for the first time.In order to ensure the safe and reliable operation of the line,a true type test was carried out on the typical tower ZC30103B to ensure its safety The reliability was verified,and the displacement,strain,and failure of the failure process under controlled conditions were analyzed.The test shows that the ZC30103B tower is designed to be safe and economical,and it is destroyed at the expected overload value.The measured value is consistent with the theoretical value and meets the actual needs of the project.

关 键 词:特高压 大截面导线 铁塔 真型实验 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象