检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:严可为 苏林 谈东林 Yan Ke-wei;Su Lin;Tan Dong-lin
机构地区:[1]中国电力工程顾问集团西南电力设计院有限公司,四川成都610021
出 处:《电力系统装备》2021年第23期195-196,共2页Electric Power System Equipment
摘 要:德宏500 kV变电站500 kV配电装置东侧最终规模连续5回出线均需加装高压并联电抗,这给高抗配电装置布置带来了很大麻烦。为了节约工程占地,结合工程实际情况,参照标准设计,根据不同设备厂家的实际工程资料进行分析比较,对高抗配电装置进行了优化设计。The final scale of 5 consecutive outgoing lines on the east side of 500 kV distribution device in Dehong 500 kV substation needs to be equipped with high-voltage parallel reactance,which brings great trouble to the layout of high reactance distribution device.In order to save the land occupation of the project,this report combines the actual situation of the project,refers to the standard design,analyzes and compares the actual engineering data of different equipment manufacturers,and optimizes the design of high impedance distribution device.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.171.178