变电站GIS设备安装及法兰固定研究  被引量:1

Research on Installation of GIS Equipment and Flange Fixing in Substation

在线阅读下载全文

作  者:徐兴龙 张晓林 王劲松 黎建东 唐琰 Xu Xing-long;Zhang Xiao-lin;Wang Jin-song;Li Jian-dong;Tang Yan

机构地区:[1]云南电网有限责任公司丽江供电局,云南丽江674100

出  处:《电力系统装备》2021年第23期203-204,共2页Electric Power System Equipment

摘  要:在进行电力保障及供应的同时,技术设备不断进步,在电力领域里对GIS设备来说也得到了更进一步的优化。其中,变电站GIS设备的安装及法兰固定就极为关键,对整体的GIS应用来说,可以保证电网在运行中的安全问题,同时针对外界环境有更好的监控作用。在整体对GIS设备进行调试和法兰固定的过程中,需要注意安装过程中可能出现的问题。对GIS设备安装及法兰固定进行详细介绍,针对当前电网的发展,并对安装的准备以及调试环节进行研究。At the same time of power guarantee and supply,technical equipment has been continuously improved,and GIS equipment has also been further optimized in the field of power.Among them,the installation and flange fixing of GIS equipment in substations are extremely critical.For the overall GIS application,it can ensure the safety of the power grid in operation,and at the same time have a better monitoring effect on the external environment.In the process of overall debugging and flange fixing of GIS equipment,it is necessary to pay attention to the problems that may occur during the installation process.The article introduces the installation of GIS equipment and flange fixing in detail,focuses on the development of the current power grid,and studies the preparation for installation and debugging.

关 键 词:电力系统 变电站 GIS设备 安装调试 法兰固定 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象