检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈渭程 甄文喜 邵冲 谢琦 SHEN Weicheng;ZHEN Wenxi;SHAO Chong;XIE Qi(Electric Power Research Institute,State Grid Gansu Electric Power Company,Lanzhou 730070,Gansu,China;State Grid Gansu Electric Power Company,Lanzhou 730030,Gansu,China;College of Electrical Engineering,Sichuan University,Chengdu 610065,Sichuan,China)
机构地区:[1]国网甘肃省电力公司电力科学研究院,甘肃兰州730070 [2]国网甘肃省电力公司,甘肃兰州730030 [3]四川大学电气工程学院,四川成都610065
出 处:《储能科学与技术》2022年第1期136-146,共11页Energy Storage Science and Technology
基 金:国家电网公司科技项目(522722191002)。
摘 要:在大规模风电基地通过高压直流输电远距离送出背景下,闭锁、换相失败等直流故障会在送端产生暂态电压扰动导致风机连锁脱网,严重威胁系统的安全稳定。建立风电外送系统模型,结合过电压下双馈风机的暂态响应分析,揭示了直流闭锁导致双馈风机连锁脱网这一过程的内在机理;进一步地,提出一种基于超导磁储能系统和改进风机控制协同的故障穿越策略:在双馈风机本身产生去磁电流和无功电流的同时,储能系统协同向双馈风机转子侧快速注入两种电流。最后,在MATLAB/Simulink中搭建仿真模型。通过与去磁控制和传统矢量控制进行对比,仿真案例和实际案例均证明所提策略在各种故障下都能够更有效地将风机各项关键参数限制在安全范围内,同时更有利于抑制直流故障后暂态过电压的幅值,从而降低连锁脱网的风险。Transmitting large-scale wind power through a line-commutated converter-based high-voltage direct current(LCC-HVDC)system has become a common trend in China.Under this condition,the transient overvoltage in the sending end caused by HVDC blocking faults or commutation failures will cause a cascaded trip-off of doubly fed induction generators(DFIG),which seriously threatens the safety and stability of power systems.The internal mechanism of the process of the DFIG cascaded trip-off caused by the HVDC blocking faults is revealed by establishing the equivalent model of the wind power integrated sending end system and by analyzing the transient response of the DFIG under the transient overvoltage.A coordinated fault ride through scheme based on the rotor side superconducting magnetic energy storage system(SMES)and modified DFIG control strategies is proposed herein.While the DFIG generates demagnetizing and reactive currents,the SMES cooperates to quickly inject demagnetizing and reactive currents into the DFIG rotor side.Simulation and real-world cases conducted in MATLAB/Simulink verified that compared with demagnetization and traditional vector control,the proposed scheme can always limit the key parameters of the DFIG in a safe range and suppress the transient overvoltage,consequently reducing the risk of cascaded tripping.
关 键 词:高压直流输电 直流闭锁 暂态过电压 双馈风机 超导磁储能系统 去磁控制 协同控制 故障穿越
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.201.19