摘 要:根据某水利枢纽大坝工程施工需要,在大坝右岸布置一条满管溜槽输送混凝土,满管溜槽在混凝土施工中已得到普遍应用。但在工程实际应用中也存在堵管、输送寿命短、布置角度要求高等特点,该文结合以往工程的应用情况对满管溜槽系统进行了改良,结合工程实际对满管溜槽系统进行布置、设计,并进行了相应的稳定性计算分析,以供参考。According to the requirement of dam construction of a water conservancy project,a full pipe chute is arranged on the right bank of the dam to transport concrete.The full pipe chute has been widely used in concrete construction.However,in the practical application of the project,there are also the characteristics of pipe blockage,short conveying life and high requirements for layout angle.This paper improves the full pipe chute system in com‐bination with the application of previous projects,arranges and designs the full pipe chute system in combination with the engineering practice,and carries out the corresponding stability calculation and analysis for reference.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.112.142