检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康建荣[1] 罗鹏 吕彩云 潘新元 KANG Jianrong;LUO Peng;LV Caiyun;PAN Xinyuan(Sinohydro Bureau 5 Co., LTD, Chengdu, Sichuan, 610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2021年第6期87-91,共5页Sichuan Hydropower
摘 要:为解决特长隧道大断面开挖初期支护湿喷混凝土回弹率高的问题,以江习高速四面山特长隧道为工程实例,阐述了对湿喷混凝土顶拱回弹、边墙回弹、流态滑落问题产生的现状从岩石与喷混凝土附着性、喷射厚度、工人操作、岩层涌水等方面展开的调查分析,针对主要因素调整了湿喷混凝土配合比与爆破参数,有效降低了施工现场湿喷混凝土回弹率,提高了围岩支护质量,加快了施工进度。In order to solve the problem of high rebound rate of wet shotcrete for primary support at large excavation sections in super long tunnels,this paper,taking Simianshan Super Long Tunnel of Jiangxi Expressway as the engineering object,investigates and analyzes the problems of rebound at top arch,on side wall and flow slip,from adhesion between rock and shotcrete,shotcrete thickness,workers'operation performance,water gushing from rock and so on.Based on the investigation and analysis,main factors as mix ratio and blasting parameters are adjusted,which effectively reduces the rebound rate of wet shotcrete on site,improves the support quality of surrounding rock and speeds up the construction progress.
关 键 词:大断面 湿喷混凝土 回弹率 江习高速四面山特长隧道 控制
分 类 号:U45[建筑科学—桥梁与隧道工程] U455[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.186