干煤棚网架高空散装扩拼法施工技术研究  被引量:2

Study on Construction Technology of High-altitude Bulk Expansion Method for Space Grid of Dry Coal Shed

在线阅读下载全文

作  者:郭泉昌 孙丰振 GUO Quanchang;SUN Fengzhen(SEPCOIII Electric Power Construction Co.,Ltd.,Qingdao 266100,China)

机构地区:[1]山东电力建设第三工程有限公司,山东青岛266100

出  处:《山东电力高等专科学校学报》2021年第6期44-47,共4页Journal of Shandong Electric Power College

摘  要:结合某燃煤电站项目干煤棚的安装,对3种干煤棚网架安装方法进行了比较,确定采用高空散装扩拼法,并介绍了干煤棚网架高空散装扩拼法的工艺流程和关键技术。实践证明,所研究的施工方法在有效控制成本的基础上,可以使安装质量达到预期效果。Combined with the installation of dry coal shed of a coal-fired power station project,three methods for space grid installation of dry coal shed are compared.The high-altitude bulk expansion method is determined to adopt,and the process flow and key technology of high-altitude bulk expansion method for space grid of dry coal shed are introduced.It has been proved by practice that the proposed construction method can achieve the expected effect of the installation quality on the basis of effectively controlling the costs.

关 键 词:干煤棚 高空散装扩拼法 施工 

分 类 号:TU758.11[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象