检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李敏[1] 孙书南 张忠辉[1] Li Min;Sun Shunan;Zhang Zhonghui(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《水利水电工程设计》2021年第4期1-4,56,共5页Design of Water Resources & Hydroelectric Engineering
摘 要:波黑ULOG水电站引水发电系统布置有1条埋藏式压力钢管,钢管长345.55 m,由上平段、上下弯管段、竖井段和下平段组成,主管内径3.0 m,主管末端设置"Y"形非对称月牙肋岔管,其后接支管,支管内径由2.1 m渐变为1.8 m后与进水蝶阀相接。对该工程压力钢管布置优化、结构设计、灌浆排水设计及防腐设计等进行了简要概述,为类似工程设计提供借鉴和参考。There is a buried penstock in the water diversion and power generation system of Ulog hydropower station in Bosnia and Herzegovina.The penstock is 345.55 m long,consisting of upper flat section,upper and lower bend sections,shaft section and lower flat section.The inner diameter of the main pipe is 3.0 m.A Y-shaped asymmetric crescent rib bifurcated pipe is set at the end of the main pipe,followed by a branch pipe.The inner diameter of the branch pipe gradually changes from 2.1 m to 1.8 m and connects with the inlet butterfly valve.This paper briefly introduces the layout optimization,structural design,irrigation and drainage design and anti-corrosion design of the penstock,which provides a reference for similar engineering design.
关 键 词:压力钢管 结构设计 灌浆设计 排水设计 防腐设计
分 类 号:S727.42[农业科学—林木遗传育种]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33