检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余良碧 Yu Liang-bi
机构地区:[1]中国水利水电第十一工程局有限公司,郑州450000
出 处:《建筑技术开发》2021年第24期143-145,共3页Building Technology Development
摘 要:黑干20标段工程地处季节冻土区,其路堤填料以粘土为主,该工程的修建职能既作为堤防工程又作为公路工程使用,表现出明显的地域特殊性、填料特殊性和工程特殊性。在查阅大量相关文献的基础上,对季节冻土区土质边坡破坏现状展开分析。探讨季节冻土区土质边坡失稳的主要因素,重点探究护坡与固脚的技术方式。Heigan section 20 project is located in seasonally frozen soil area,and its embankment filler is mainly clay.The construction function of the project is used as both embankment project and highway project,showing obvious regional particularity,filler particularity and engineering particularity.On the basis of consulting a large number of relevant literature,this paper analyzes the failure status of soil slope in seasonally frozen soil area.This paper discusses the main factors of soil slope instability in seasonal frozen soil area,focusing on the technical methods of slope protection and foot reinforcement.
分 类 号:TV861[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49