检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕辉 徐宇鸣 LV Hui;XU Yuming(China Construction Science and Industry Corporation Ltd.Shenzhen 518038,China;Shenzhen CAPOL International&Associates Co.,Ltd.Shenzhen 518038,China)
机构地区:[1]中建科工集团有限公司,深圳518038 [2]深圳市华阳国际工程设计股份有限公司,深圳518038
出 处:《广东土木与建筑》2022年第1期18-21,共4页Guangdong Architecture Civil Engineering
摘 要:深圳多地区分布了可溶性碳酸盐类岩石(灰岩),越来越多的超高层建筑新建于岩溶地区之上。基于岩溶地区某超高层项目基础设计过程中的分析及总结,着重介绍了:不同地质情况基础型式选取建议及嵌岩桩基础设计,嵌岩桩超前钻勘察孔点布置及优化,桩端稳定持力层的研判方法。Soluble carbonate rocks(limestone)are distributed in many areas of Shenzhen.More and more super high-rise buildings are built on karst areas.Based on the analysis and summary of the foundation design process of a super high-rise project in karst area,this pa‐per focuses on the selection of foundation types under different geological conditions,the design of rock-socketed pile foundation,the layout and optimization of advance drilling,and research and judgment of stable bearing stratum.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171