桑河二级水电站大坝围堰填筑施工关键技术  

Key Technology of Dam Cofferdam filling Construction of Sanghe II Hydropower Station

在线阅读下载全文

作  者:唐政军 TANG Zhengjun(Shenzhen Water Technology Service Co.,Ltd.,Shenzhen Guangdong 518061)

机构地区:[1]深圳市水务技术服务有限公司,广东深圳518061

出  处:《智能建筑与工程机械》2021年第12期10-12,共3页Intelligent Building and Construction Machinery

摘  要:桑河二级水电站二期上、下游围堰填筑工程量大、施工工期紧、填筑强度高、质量要求严,因此,切实抓好填筑施工管控极为关键。基于此,本文结合该项目围堰填筑施工实际,就水电站大坝围堰填筑施工关键技术予以细致探究,以供众水电施工同仁借鉴参考。The upstream and downstream Cofferdams of phase II of Sanghe hydropower station have large filling quantities,tight construction period,high filling intensity and strict quality requirements.Therefore,it is very important to pay close attention to the filling construction control.Based on this,combined with the actual cofferdam filling construction of the project,this paper makes a detailed exploration on the key technologies of dam cofferdam filling construction of hydropower station for reference.

关 键 词:水电站大坝 围堰填筑 施工关键技术 

分 类 号:TU47[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象