检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐凤奎 马军林 XU Feng-kui;MA Jun-lin(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《云南水力发电》2022年第1期168-170,共3页Yunnan Water Power
摘 要:地下交通隧洞在开挖过程中大多会遇到不同程度地塌方,实践充分表明塌方处理贵在快速和安全,部分塌方处理对工程建设影响很大,导致现场安全隐患突出,施工工期延长和成本增加,因此针对不同塌方采取切实可行的措施是塌方处理的关键。塌方处理采用混凝土回填在拱部形成新的承载圈是一种比较安全、稳妥的措施。Most underground traffic tunnels will collapse in different degrees during excavation.Practice fully shows that landslide treatment is expensive in speed and safety.Partial collapse treatment has a great influence on the project construction,resulting in outstanding potential safety hazards on site,prolonged construction period and increased cost.Therefore,practical measures for different landslides are the key to landslide treatment.It is a safe and stable measure to form a new bearing ring in the arch by backfilling concrete in the treatment of collapse.
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7