秘鲁圣加旺Ⅲ水电站水轮机模型验收试验分析  被引量:1

Acceptance Test Analysis of Turbine Model for San Gabán Ⅲ Hydropower Station in Peru

在线阅读下载全文

作  者:胡定辉 周耕辛 田子勤 王豪 何峰 马凌腾 HU Ding-hui;ZHOU Geng-xin;TIAN Zi-qin;WANG Hao;HE Feng;MA Ling-teng(Changjiang Institute of Survey,Planning,Design and Research,Wuhan 430010,China;China International Water&Electric Corp.,Beijing 100011,China)

机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010 [2]中国水利电力对外有限公司,北京100011

出  处:《云南水力发电》2022年第1期220-223,共4页Yunnan Water Power

摘  要:圣加旺Ⅲ级水电站水轮机水力设计和制造均由国内厂家自主完成,是首台国产的100MW级冲击式水轮机。2019年8月厂家对圣加旺水电站的水轮机模型进行了验收试验,试验项目及程序符合IEC60193的要求,试验结果均满足设计和合同文件的要求。该试验结果可以指导电站的实际运行,其研发成果为大中型冲击式水轮机组的国产化和技术进步奠定了坚实的基础。The hydraulic design and manufacture of turbine in San Gabán III Hydropower Station are independently completed by domestic manufacturers,which is the first 100 MW pelton turbine in China.In August 2019,the acceptance test of the turbine model of San Gabán III Hydropower plant was carried out on the test rig about pelton turbine of unit manufacturers.Through the analysis of the test results,the test meet the requirements of unit equipment Contract.The test results can not only guide the actual operation of the power station,but also provide reference for the design of other domestic impulse hydropower stations.

关 键 词:圣加旺III级水电站 冲击式水轮机 模型试验 验收 

分 类 号:TK730.7[交通运输工程—轮机工程]

 