检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨志虎 YANG Zhi-hu(Yunnan Huadian Liyuan Power Generation Branch,Lijiang 674122,China)
机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674122
出 处:《云南水力发电》2022年第1期230-232,共3页Yunnan Water Power
摘 要:溢洪道在运行期间使泄槽混凝土长时间的受到水流的高速冲刷及库区漂浮物的冲击、碰撞,致使泄槽混凝土出现了大小不一的凹坑,严重影响着电站汛期的泄洪,威胁着大坝和机组发电的安全。以梨园水电站溢洪道泄槽产生的凹坑为例,从施工、水体、运行时间三方面对混凝土凹坑产生的原因进行了分析,并对混凝土凹坑的修复处理进行了详细的阐述。During the operation of the spillway,the concrete of the discharge channel is subjected to high-speed scouring of water flow for a long time and impact and collision of floating debris in the reservoir area,resulting in various pits in the concrete of the discharge channel.It seriously affects flood discharge during flood season and threatens the safety of dam and unit power generation.Taking the pit produced by spillway discharge channel of Liyuan Hydropower Station as an example,this paper analyses the cause of concrete pit from three aspects of construction,water body and operation time,and elaborates on the repair treatment of concrete pit in detail.
分 类 号:TV698.25[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.196.220