检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:葛昕 孙玉厚 GE Xin;SUN Yu-hou(Beijing Urban Construction Sixth Group Co.,Ltd.,100081,Beijing,China)
机构地区:[1]北京城建六建设集团有限公司,北京100081
出 处:《建筑技术》2022年第1期31-34,共4页Architecture Technology
摘 要:三亚体育场施工中通过应用BIM技术进行设计方案确定、专业间图纸审查、施工场地布置、BIM5D管理平台、BIM+VR技术、机电管线综合排布、施工方案模拟及可视化交底、工厂预制加工等,助力EPC项目新技术应用,缩短了工期,降低了造价,避免了拆改,提高了施工质量,实现了项目管理目标。BIM technique was used in Sanya Stadium construction for design scheme determination,drawing inspection among disciplines,construction site arrangement,BIM5D management platform,BIM+VR technique,general layout of mechanical and electrical pipelines,construction scheme simulation and visible disclosure and pre-fabrication in factory,etc.,to assist the application of new technique in EPC project,shorten the construction period,reduce construction cost,avoid dismantlement and reconstruction,improve construction quality and reach the engineering management targets.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.212.53