三亚体育场工程EPC模式下BIM技术的综合应用  被引量:8

GENERAL APPLICATION OF BIM TECHNIQUE IN SANYA STADIUM EPC PROJECT

在线阅读下载全文

作  者:葛昕 孙玉厚 GE Xin;SUN Yu-hou(Beijing Urban Construction Sixth Group Co.,Ltd.,100081,Beijing,China)

机构地区:[1]北京城建六建设集团有限公司,北京100081

出  处:《建筑技术》2022年第1期31-34,共4页Architecture Technology

摘  要:三亚体育场施工中通过应用BIM技术进行设计方案确定、专业间图纸审查、施工场地布置、BIM5D管理平台、BIM+VR技术、机电管线综合排布、施工方案模拟及可视化交底、工厂预制加工等,助力EPC项目新技术应用,缩短了工期,降低了造价,避免了拆改,提高了施工质量,实现了项目管理目标。BIM technique was used in Sanya Stadium construction for design scheme determination,drawing inspection among disciplines,construction site arrangement,BIM5D management platform,BIM+VR technique,general layout of mechanical and electrical pipelines,construction scheme simulation and visible disclosure and pre-fabrication in factory,etc.,to assist the application of new technique in EPC project,shorten the construction period,reduce construction cost,avoid dismantlement and reconstruction,improve construction quality and reach the engineering management targets.

关 键 词:EPC BIM 管线综合排布 施工方案模拟 

分 类 号:TU17[建筑科学—建筑理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象