双江口地下厂房洞室群施工期安全监测临时自动化系统规划  被引量:1

Planning of temporary automatic monitoring system during construction of underground powerhouse caverns of Shuangjiangkou hydropower station

在线阅读下载全文

作  者:彭涛 文豪 PENG Tao;WEN Hao(Dadu River Hydropower Development Co.,Ltd.)

机构地区:[1]国能大渡河流域水电开发有限公司,四川成都610041

出  处:《大坝与安全》2021年第5期10-14,共5页Dam & Safety

摘  要:为了及时、准确掌握施工期地下厂房洞室群开挖过程中的安全性态,指导现场安全施工和反馈设计,双江口水电站需要在地下厂房洞室群大规模开挖前完成安全监测临时自动化系统的建设,实时捕捉施工过程中由高地应力释放、开挖爆破等因素引起的围岩变形及支护应力调整,发挥施工现场安全监测预警功能。笔者从地下厂房洞室群施工期临时自动化系统建设的必要性和重要性入手,结合工程实例,阐述施工期安全监测临时自动化系统建设的设计思路、规划方案与预警手段,为今后类似工程的设计提供参考和借鉴。Timely and accurate information about the safety status of underground powerhouse cavern during excavation of construction is needed for construction guidance and design feedback.To play the role of safety monitoring and early warning,the establishment of temporary automatic monitoring system before excavation of the underground powerhouse cavern of Shuangjiangkou hydropower station is of great importance,which aims to monitor the deformation of surrounding rock caused by relief of high ground stress and blasting,as well as to adjust the support force.This paper mainly introduces the design,planning and warning measures of the temporary automatic monitoring system of Shuangjiangkou hydropower station,for reference.

关 键 词:洞室群 施工期 安全监测 施工期监测自动化 安全预警 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象