二滩水电站枯水期尾水水位流量关系研究  被引量:3

Study on the relationship between tail water level and flow rate of Ertan hydropower station during dry season

在线阅读下载全文

作  者:商云笛 韩先宇 吴文勇 SHANG Yundi;HAN Xianyu;WU Wenyong(Yalong River Hydropower Development Co.,Ltd.)

机构地区:[1]雅砻江流域水电开发有限公司,四川成都610051

出  处:《大坝与安全》2021年第6期14-16,27,共4页Dam & Safety

摘  要:对二滩水电站尾水水位、流量和桐子林水电站坝前水位实测数据进行统计,分析了二滩水电站上、下游主要梯级水库电站对二滩水电站平、枯水期流量的影响,研究了桐子林水库蓄水初期不同坝前水位时二滩尾水水位-流量关系变化特征,计算了桐子林水库淤积20年、坝前水位1015 m时,二滩水电站4~6台机组满负荷发电时二滩尾水水位,给尾水河床护岸等修复工程提供了参考。The measured tail water level and flow rate of Ertan hydropower station as well as the data of sedimentation and water level upstream of Tongzilin hydropower station are analyzed,and the influence from main cascade hydropower stations upstream and downstream to the flow of Ertan hydropower station during normal and dry periods is studied,which provides the basis for further restoration works of the downstream river revetment.

关 键 词:尾水水位 枯水期流量 梯级水库电站 变化特征 

分 类 号:TV221[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象