检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴建军[1]
机构地区:[1]柳州铁道职业技术学院信号教研室,广西柳州545616
出 处:《大众科技》2021年第12期5-7,145,共4页Popular Science & Technology
基 金:2020年度广西职业教育教学改革研究项目“铁道信号自动控制专业面向东盟协同培养国际化人才实践与研究”(GXGZJG2020B173)。
摘 要:随着铁路建设的快速发展和提高运输效益的要求,需要对大量的既有车站的信号控制设备进行更新改造;改造的车站在开通前必须利用天窗或施工点,模拟室外设备条件后,将新的联锁软件倒替原有软件,对变动部分的设备进行联锁试验,并在天窗或施工点结束前,拆除室外模拟条件恢复原样倒回原有联锁软件进行相关试验,确保车站既有设备正常后交付车站使用。软件倒替试验时间长、风险高,对施工的影响非常大,间接影响行车的效率,联锁软件倒替对提高运输效率和信号设备的升级有着重要的意义,因此既保证行车安全又完成信号设备过渡施工是一项重要的工作。文章对两年来管辖站场信号设备过渡施工中存在的联锁软件倒替问题进行了深入的分析,找出造成施工效率低下的原因并提出有益的整改措施,对既有车站的改造意义重大。With the rapid development of railway construction and the requirements of improving transportation efficiency,it is necessary to update and transform a large number of signal control equipment in existing stations.Before the opening of the reconstructed station,the skylight or construction point must be used to simulate the outdoor equipment conditions.After the new interlocking software is replaced by the original software,the interlocking test shall be carried out on the equipment of the changed part.Before the skylight or construction point is completed,the outdoor simulation conditions shall be removed,the original interlocking software shall be restored,and relevant tests shall be carried out to ensure that the existing equipment in the station can be delivered to the station after normal operation;the software replacement test takes a long time and has a high risk,which has a great impact on the construction and indirectly affects the driving efficiency.The interlocking software replacement is of great significance to improve the transportation efficiency and the upgrading of signal equipment.Therefore,it is an important work to ensure the driving safety and complete the transition construction of signal equipment.This paper makes an in-depth analysis on the problem of interlocking software replacement existing in the transition construction of station signal equipment in the past two years,finds out the causes of low construction efficiency,and puts forward useful rectification measures,which is of great significance to the transformation of existing stations.
分 类 号:U284.95[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.111.52