High RF power tests of the first 1.3 GHz fundamental power coupler prototypes for the SHINE project  被引量:4

在线阅读下载全文

作  者:Zhen-Yu Ma Shen-Jie Zhao Xu-Ming Liu Yue-Chao Yu Hong-Ru Jiang Xiang Zheng Qiang Chang Zi-Gang Zhang Kai Xu Yan Wang Yu-Bin Zhao Hong-Tao Hou 

机构地区:[1]Shanghai Advanced Research Institute,Chinese Academy of Sciences,Shanghai 201204,China

出  处:《Nuclear Science and Techniques》2022年第1期107-119,共13页核技术(英文)

基  金:supported by Shanghai Municipal Science and Technology Major Project(No.2017SHZDZX02)。

摘  要:The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described.

关 键 词:Superconducting accelerating cryomodule 1.3 GHz fundamental power coupler RF conditioning Test bench Horizontal test cryostat 

分 类 号:TN622[电子电信—电路与系统]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象