检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王革奇 WANG Geqi(Anqing Copper Mine,Tongling Nonferrous Metals Group Co.,Ltd.)
出 处:《现代矿业》2022年第1期223-226,231,共5页Modern Mining
摘 要:安庆铜矿于1991年投料试车,1999年延伸至-580 m水平开采,2014年延伸至-900 m水平开采。矿山自2000年以来,年处理量一直稳定在115.5万t,延伸开采后,矿山设计矿石综合电耗约为90(kW·h)/t。为进一步降低能源消耗,对矿山供配电系统、压风系统、通风系统、提升系统、选矿系统、给排水系统、选矿系统等进行优化与改造。到2020年,矿山综合电耗为68(kW·h)/t,取得了明显效益。The Anqing Copper Mine was put into trial operation in 1991,extended to-580 m level mining in 1999,and extended to-900 m level mining in 2014.Since 2000,the mine's annual processing capacity has been stable at 1.155 million tons.After extended mining,the mine's designed comprehensive power consumption for ore is about 90(kW•h)/t.In order to further reduce energy consumption,the mine's power supply and distribution system,compressed air system,ventilation system,lifting system,beneficia⁃tion system,water supply and drainage system,beneficiation system,etc.have been optimized and trans⁃formed.By 2020,the comprehensive power consumption of the mine will be 68(kW·h)/t,which has achieved significant benefits.
分 类 号:TD85[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147