检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李绪萍[1] LI Xuping(Inner Mongolia University of Science&Technology,Baotou 014010,China)
出 处:《煤炭技术》2022年第1期71-73,共3页Coal Technology
摘 要:厚硬基本顶综放工作面开采强度高、基本顶厚度大,区段煤柱的稳定性直接影响着巷道的安全稳定,针对这一影响因素,采用理论分析、数值模拟的方法计算分析沿空巷道的覆岩结构特征及应力位移变化情况,确定合理煤柱宽度。结果表明:厚硬基本顶主要破断方式为两端拉断作用下破坏,计算得到巷道煤柱的留设宽度为7.5 m以上,分析了不同宽度煤柱下的垂直应力及形变量,最终确定煤柱合理留设宽度应为8 m。The mining intensity of fully mechanized top coal caving face with thick and hard basic roof is high, and the thickness of basic roof is large. The stability of section coal pillar directly affects the safety and stability of roadway. In view of this influencing factor, the overburden structure characteristics and stress displacement changes of gob side entry are calculated and analyzed by theoretical analysis and numerical simulation, and the reasonable coal pillar width is determined. The results show that the main breaking mode of thick and hard basic roof is under the action of two ends breaking, the reserved width of roadway coal pillar is calculated to be at least 7.5 m, the vertical stress and shape variables under different width coal pillars are analyzed, and the reasonable reserved width of coal pillar is determined to be 8 m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.238