检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张谷泉 卢雄 ZHANG Guquan;LU Xiong(Hunan Planning&Designing Institute of Posts&Telecommunications Co.,Ltd.,Changsha 410000,China;Troops 75841,Changsha 410000,China)
机构地区:[1]湖南省邮电规划设计院有限公司,湖南长沙410000 [2]75841部队,湖南长沙410000
出 处:《通信电源技术》2021年第16期107-109,共3页Telecom Power Technology
摘 要:自开展“宽带中国”战略以来,为了更好地实现乡镇、行政村宽带覆盖及提速,快速实现FTTH建设,需要新建大量的OLT设备或对原OLT进行PON端口扩容。运营商网络扁平化趋势下,为了节约机房建设和运维等成本,OLT逐渐集中化建设。而随着FTTH大规模建设,对于PON网络实现乡镇、行政村全面覆盖带来巨大的挑战。Since the launch of the“Broadband China”strategy,in order to better achieve broadband coverage and speed increase in towns and administrative villages,and to quickly implement FTTH construction,it is necessary to build a large number of OLT equipment or expand the original OLT PON port.Under the trend of flattened networks of operators,OLTs are gradually centralized construction in order to save costs such as computer room construction and operation and maintenance.With the large-scale construction of FTTH,it has brought huge challenges to the PON network to achieve comprehensive coverage of towns and administrative villages.
分 类 号:TN9[电子电信—信息与通信工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7