检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李晓莉 LI Xiao-li(Gansu Provincial Bureau of Geology and Mineral Exploration and Development Bureau,Hydrogeological Engineering Geological Survey Institute,Zhangye 734000,China)
机构地区:[1]甘肃省地质矿产勘查开发局水文地质工程地质勘察院,张掖734000
出 处:《价值工程》2022年第6期13-15,共3页Value Engineering
摘 要:金昌市金川区龙景村小沙沟山洪沟道治理项目在施工过程中将不可避免扰动地面,破坏原有水土资源,降低当地土地生产力,在暴雨作用下,加剧水土流失。因此科学准确的预测施工期水土流失、成因、类型、分布、数量及其危害,对于合理正确的制定水土保持方案以及有效的防治水土流失具有十分重要的意义。In the construction of Xiaoshagou simplex gully control project in Longjing Village,Jinchuan District,Jinchang,it is inevitable to disturb the ground earth′s surface,destroy the original water and soil resources,reduce the local land productivity,and intensify the soil erosion under the impact of rainstorm.Therefore,the scientific and accurate prediction of the causes,types,distribution,quantity and hazard of soil and water loss during construction period are of great significance for the correct and reasonable formulation of soil and water conservation program and effective prevention and control of soil and water loss.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229