驮英水库施工期破堰影响分析  

Analysis of weir breaking impact in construction period of Tuoying Reservoir

在线阅读下载全文

作  者:陶昌弟[1] 杨晓庆 TAO Chang-di;YANG Xiao-qing(Guangxi Water and Power Design Institute Co.,Ltd.,Nanning 530023,China)

机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023

出  处:《广西水利水电》2022年第1期52-56,共5页Guangxi Water Resources & Hydropower Engineering

摘  要:根据驮英水库施工导流方式及水文条件,结合枢纽大坝实际施工面貌,分析工程存在的重大险情,并拟定6个围堰破堰方案,采用数值法分析计算各破堰方案对下游的影响,为科学合理制定库区及坝址下游防汛抢险应急预案提供技术依据。According to the construction diversion design and hydrological conditions of Tuoying Reservoir,com⁃bined with the construction progress of main dam,analysis was made on the major danger of the project;six weir breaking schemes were drafted for main dam construction.Numerical method was adopted to analyze and calculate the impact of various weir breaking schemes on downstream area,so as to provide technical basis for the flood con⁃trol emergency plan of reservoir area and downstream area.

关 键 词:施工度汛 破堰影响 应急预案 驮英水库 

分 类 号:TV122.4[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象