检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:莫品强 刘尧[1] 高新慰 章正 Mo Pinqiang;Liu Yao;Gao Xinwei;Zhang Zheng(State Key Laboratory for GeoMechanics and Deep Underground Engineering,School of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou 221116,Jiangsu,China;MCC Wuhan Survey Research Institute,Wuhan 430080,Hubei,China)
机构地区:[1]中国矿业大学深部岩土力学与地下工程国家重点实验室力学与土木工程学院,江苏徐州221116 [2]中冶集团武汉勘察研究院有限公司,湖北武汉430080
出 处:《岩土工程技术》2022年第1期1-9,共9页Geotechnical Engineering Technique
基 金:国家自然科学基金(51908546);中国博士后科学基金面上项目(2020T130699)。
摘 要:挤土桩在沉桩过程中的挤土效应对其承载力有明显的提高作用,基于有限介质弹塑性小孔扩张理论提出一种新的挤土桩承载力的计算方法。通过Mohr-Coulomb屈服准则推导了有限介质球形孔和柱形孔扩张的统一解析解,分析了打桩过程中的贯入挤土作用,并建立了桩基承载力的计算模型。结果表明:小孔扩张过程中具有明显尺寸效应,对于柱形孔扩张,当外内径比大于110时,有限土体扩张的内壁孔压和塑性区范围与无限土体扩张的大致相同;球形孔土体外内径比大于25时与无限土体扩张曲线一致;将桩端部分简化为球形孔扩张模型,桩侧部分假设为柱形孔扩张模型,求解得到了沉桩施工中桩周土体的应力场变化及成桩后桩基承载力值。桩基承载力计算结果与现有理论解、规范计算值和工程现场实测值进行对比,验证了本文方法的可靠性,为挤土桩的承载力预测提供了一种新的计算方法。Installation of displacement pile could significantly increase the bearing capacity of pile foundation,and a new analytical method for bearing capacity prediction of displacement pile is proposed based on the elastic-plastic cavity expansion solution in finite soil medium.Mohr-Coulomb yield criterion is used to derive the unified analytical solution for both cylindrical and spherical cavities,assuming the pressure is remained constant at the outer boundary.The solutions are then adopted to analyze the penetration of precast pile,and a mechanical model for pile bearing capacity is constructed.The results show that scale effect is important for cavity expansion.For cylindrical cavities,the cavity pressure and the plastic zone of a finite medium with outer/inner radius ratio greater than 110 is similar to that of infinite medium,whereas the soil expansion curve is comparable for spherical scenarios with outer/inner radius ratio larger than 25.The mechanical model assumes the spherical cavity expansion at the pile end,and pile shaft is taken as cylindrical cavity expansion,which provides the changes of stress field during displacement pile installation and the bearing capacity.The magnitude of pile bearing capacity is compared with existing solution,standard design value,and measured data from field test,validating the proposed novel cavity-expansion based method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.67.245