检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘飞[1] 王博 周志健[1] 王飞宇[1] 解永飞 隋杰明[1] LIU Fei;WANG Bo;ZHOU Zhijian;WANG Feiyu;XIE Yongfei;SUI Jieming(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200135,China)
机构地区:[1]中国建筑第八工程局有限公司,上海200135
出 处:《施工技术(中英文)》2021年第24期20-24,44,共6页Construction Technology
摘 要:国家会展中心(天津)一、二期屋面工程设计为高强铝镁锰节能金属屋面系统,结合类似屋面工程施工及维护阶段发现的问题,对本工程特点进行重难点分析和辨识,该项目整体屋面造型多、实施难度大、操作空间受限,整体节能和防渗漏功能保障性要求高。综合考虑整体金属屋面系统从标准节点到特殊部位节点的设计进行全面深化和处理,整理并完善现场管控措施,通过创新中空式构造、底板吊挂安装技术、装配式安装等,使大面积金属屋面安装形成标准化、流水化施工,同时实现整体屋面系统节能和防渗漏双目标。The phase I and phase II of the roofing engineering design of National Convention and Exhibition Center(Tianjin) is a high-strength metallic roofing system made up of aluminum, magnesium and manganese. Combined with similar roof problems found during roof construction and maintenance phases, difficult point analysis and identification of the engineering characteristics of is conducted in this paper accordingly. The overall roof shape of his project which is large in number, quite limited in operation space and has high overall protection requirements of energy saving and leakage-proof function, is rather difficult to implement. Considering the overall metallic roofing system, the standardized and streamline construction of large metal roofing installation came into being with comprehensive deepening and processing from the design of standard node to the node of specific parts, re-organizing and optimizing control measures, through the innovation of the hollow structure, hanging installation technology of bottom plates, prefabricated installation, etc. Meanwhile, the targets of ensuring the energy saving and leakage-proof of the overall roof system are realized.
关 键 词:会展中心 金属屋面 安装 节能 防渗漏 中空式构造
分 类 号:TU765[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80