检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高晖[1] 杨瑞刚 李世纬[1] 盛雅雯 胡晶晶[3] GAO Hui;YANG Ruigang;LI Shiwei;SHENG Yawen;HU Jingjing(CCCC Second Highway Survey and Design Institute Co.,Ltd.,Wuhan,Hubei 430056,China;No.2 Hydrologic Engineering Geology Group of Xinjiang Bureau of Geology and Mineral Resources,Changji,Xinjiang 831100,China;Institute of Highway Science and Technology,Xinjiang Production and Construction Corps,Urumqi,Xinjiang 830000,China)
机构地区:[1]中交第二公路勘察设计研究院有限公司,湖北武汉430056 [2]新疆地矿局第二水文工程地质大队,新疆昌吉831100 [3]新疆生产建设兵团公路科学技术研究所,新疆乌鲁木齐830000
出 处:《施工技术(中英文)》2021年第23期79-82,93,共5页Construction Technology
基 金:交通运输部建设科技项目(2014318365110);兵团重大科技计划项目(2020AA002)。
摘 要:以G0711天山北坡段为研究对象,通过线路调查,查明沿线山前冲洪积区、乌鲁木齐河阶地区、剥蚀构造中山区、山间断陷盆地积雪段占比不同,山前冲洪积区及山间断陷盆地积雪较多,并分析其形成原因;进行现场试验测量积雪密度,经测量积雪密度较小,属于新雪;对风吹雪地段采用Fluent软件进行数值模拟,分析风吹雪灾害最可能发育的具体地带,并提出填方路基坡比设置为1∶4及背风半路堑路基两侧设置积雪平台的建议,为防治工程提供依据;提出防治建议,采取路基设计及工程防治措施(防雪栅栏、储雪沟、防雪林)联合实施。This paper takes the north slope section of Tianshan G0711 as the research object. Through investigating the line, it is found that the proportions of the snow cover section are different in the piedmont alluvial proluvial area, Urumqi River terrace area, middle mountain area of denudation structure and intermountain fault basin, and there is more snow cover in the piedmont alluvial proluvial area and intermountain fault basin. Its formation reasons are analyzed. Field test is carried out to measure the snow density. The measurement results show that the snow density is small and belonged to fresh snow. Fluent software is used to simulate and analyze the specific zone where snowdrift disaster is most likely to happen in the study area. In order to provide basis for prevention and control engineering, it is proposed that the slope ratio in fill subgrade is set to 1∶4 and the snow platform is set on both sides of leeward half cut. The prevention and control proposals that roadbed design and engineering prevention measures(snow fence, snow storage ditch, snow forest) are jointly implemented are put forward.
分 类 号:U416.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80