1680 m^(3)高炉全铸铁生产开炉实践  

OPENING PRACTICE OF 1680 m^(3)BLAST FURNACE FULL CAST IRON PRODUCTION

在线阅读下载全文

作  者:唐超 Tang Chao(Zhong Jin Stainless Steel Company Limited of Guang Xi Liu Zhou Steel,Yulin 537624,China)

机构地区:[1]广西柳钢中金不锈钢有限公司,玉林537624

出  处:《冶金信息导刊》2022年第1期30-33,共4页Metallurgical Information Review

摘  要:柳钢中金公司新建2号高炉于2021年5月10日点火送风,铁水全铸块,开炉前制定了详细有效的生产组织方案,开炉配料计算精确,炉温调控及时合理,铸铁工序采取有效技改措施,高炉和铸铁工序生产平衡有序,顺利达成了预期目标。Zhong jin company’s 1680 m^(3) blast furnace was put into operation on May 10,2021,which adopt molten iron product iron block.The preparatory work such as developed detailed effective production organization plan,reasonable material calculation,furnace temperature control timely and reasonable,cast iron process to take effective technical measures,the blast furnace and cast iron production balanced and orderly,and finallly achieved the anticipate.

关 键 词:高炉 铸铁 开炉 方案 达产 

分 类 号:TF5[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象